img

AFOAKWA

CONSTRUCTION OF RESIDENTIAL FACILITY FOR MR AFOAKWA AT LABONE

Project Duration: AUG 2014 – DEC 2016
Floor Area: 588m²
Purpose: RESIDENTIAL
Description

The facilities constructed were 2nr 2- storey residential facilities. The external walls were plastered and painted. The ceiling finish was plasterboard and the floor finish were Spanish floor tiles. The sewerage system used was the biofill with a filtration bed connected to pipes for re use when gardening.

Client: MR. AFOAKWA
Consultancy

Talk To Our Professionals

Need professional advice or general consultancy for your next project? Our qualified professionals are ever ready to assist you. Complete the form and they will gladly contact you in the shortest possible time.

Top